{"id":2764,"date":"2022-05-25T08:28:00","date_gmt":"2022-05-25T06:28:00","guid":{"rendered":"https:\/\/petoro.wpenginepowered.com\/nyhet\/pdo-for-halten-east-submitted-today\/"},"modified":"2026-03-19T11:15:13","modified_gmt":"2026-03-19T10:15:13","slug":"pdo-for-halten-east-submitted-today","status":"publish","type":"nyhet","link":"https:\/\/petoro.no\/en\/nyhet\/pdo-for-halten-east-submitted-today\/","title":{"rendered":"PDO for Halten East submitted today"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">&#8211; Halten \u00d8st utilizes existing gas infrastructure in line with our strategy. Here, the companies have worked across the licenses to find good solutions for the best possible resource recovery, says CEO Kristin Kragseth in Petoro and adds that the development will ensure gas to Europe and value creation to Norway. <\/p>\n\n<p class=\"wp-block-paragraph\">Halten \u00d8st is a common term for several smaller discoveries and prospects, each of which struggled to find economically good development alternatives. In 2020 the licensees in four licenses agreed to coordinate a development of the area. Recoverable reserves in Halten \u00d8st are estimated at close to 16 million Sm3 of oil equivalents or around 100 million barrels of oil equivalents where approx. 60% is gas to be sent to Europe via K\u00e5rst\u00f8.   <\/p>\n\n<p class=\"wp-block-paragraph\">Halten \u00d8st is a subsea development with five bottom frames connected to established infrastructure on the \u00c5sgard field, which provides good resource utilization with high value creation, low development costs and low CO2 emissions. The project is planned to be developed in two phases. Phase 1 with six wells in the period 2024-2025 and phase 2 planned to be developed in 2029. Production start of the first two wells is planned in 2025. Thereafter, the wells will be put into production as they are completed.    <\/p>\n\n<p class=\"wp-block-paragraph\">Partners<br\/>Equinor Energy AS 57.70% (operator), Petoro AS 5.90, V\u00e5r Energi AS 11.80, Spirit Energy AS 24.60<\/p>\n\n<p class=\"wp-block-paragraph\">Facts<br\/>Halten \u00d8st consists of the discoveries Gamma, Harepus, Flyndretind, Nona, Sigrid and Natalia and is a subsea development connected to the \u00c5sgard facilities. Drilling of up to ten wells is planned. Gas and oil \/ condensate are sent on to \u00c5sgard B for processing and oil and condensate are stored in \u00c5sgard C for export by ship. Produced gas is sent through the \u00c5sgard Transport gas pipeline to K\u00e5rst\u00f8 and further on to Europe. \u00c5sgard has been producing oil since May 1999 and gas since October 2000.    <\/p>\n","protected":false},"featured_media":2765,"template":"","meta":{"_acf_changed":true},"tags":[94],"class_list":["post-2764","nyhet","type-nyhet","status-publish","has-post-thumbnail","hentry","tag-94"],"acf":[],"_links":{"self":[{"href":"https:\/\/petoro.no\/en\/wp-json\/wp\/v2\/nyhet\/2764","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/petoro.no\/en\/wp-json\/wp\/v2\/nyhet"}],"about":[{"href":"https:\/\/petoro.no\/en\/wp-json\/wp\/v2\/types\/nyhet"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/petoro.no\/en\/wp-json\/wp\/v2\/media\/2765"}],"wp:attachment":[{"href":"https:\/\/petoro.no\/en\/wp-json\/wp\/v2\/media?parent=2764"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/petoro.no\/en\/wp-json\/wp\/v2\/tags?post=2764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}